Akkumulation
2017
non-woven fabric, hot glue, accessories / Vliesstoff, Heißkleber, Zubehör
L 328 cm W 285 cm H 285 cm
Kunstturm Mücke, Germany
For the installation in the loading tower of the former ore washing plant in Mücke, the previous function of pouring is in the foreground. At the time, the lumps of ore would reach the tower via a conveyor belt and would then fall through the still visible shaft into the lorries standing by. From this action, which characterises the location, the essence of the movement and energy remains in the form of a transparent, upside down pyramid, which in its dimensions has been adapted to the tower’s architecture.
Photographs: Volker Schönhals
Für die Installation im Verladeturm der früheren Erzwäschestation in Mücke steht die ehemalige Funktion der Schüttung im Vordergrund. Die Erzbrocken erreichten damals per Förderband den Turm und fielen dann durch den noch immer zu sehenden Schacht in die bereitstehenden Loren. Von dieser fortwährenden Aktion bleibt die Essenz der Bewegung und Energie in Form einer auf dem Kopf stehenden transparenten Pyramide, die in ihren Ausmaßen der Architektur des Turms angepasst ist.